Case Studies

Pickle Research Center - MER Clean Room

Researchers at the University of Texas J.J. Pickle Research Center needed more clean room space in the Microelectronics Research building, but had occupied all of the available clean space in the building.

Center for Innovation in Advanced Development and Manufacturing

BSL-2 manufacturing and BSL-3 laboratory spaces with clean utility systems including RODI, WFI, pure steam, process gasses, and biological waste decontamination.

Pools of Fun

Swimming pools are wonderful amenities if they are clean, clear, and suitably maintained.

St. Edward’s University Satellite Chiller Plant and Distribution

EEA’s master planning efforts for St. Edward’s University in Austin identified the need for significant increases to chilled water system capacity.

Semiconductor Fabrication Facility

EEA assisted a confidential client in the installation and removal of approximately 100 tools, as well as 50 separate projects in an operational fab.

St. Edward’s University Natural Science Facility Phase 2 Commissioning

EEA was hired to commission the new 64,700 square feet Natural Science Facility Phase 2 building which achieved an Austin Energy Green Building 3-star rating.

Seaholm Power Plant Commissioning

EEA was chosen as the Commissioning Agent for the conversion of the old power plant into a 130,000 square foot shell office building.

California Energy Code Design (Title 24)

EEA was asked by several of our clients to assist in modifying their design standards to address the changes to the California energy code.

Oak Creek Plaza - LEED Gold

This two-story 45,000 square foot shell medical office building was designed and constructed in 2009.

Hyatt Lost Pines

EEA provided the hydraulic and electric design for the lazy river and multiple pools, hot tubs, and fountains located outside of the main hotel.