Case Studies

Tier 3 Data Center

EEA's design added two redundant 180kVA UPS, an additional 60 ton air cooled chiller, and multiple 500 gallon buffer tanks.

Chihuly Bridge of Glass

The Chihuly Bridge of Glass is a 500 foot pedestrian bridge that crosses a major Tacoma, Washington interstate.

Chemical Packaging Line Expansion

Volatile Situation In 2013 a high-purity chemical supplier to the…

Singapore Electronics Manufacturing Plant

EEA completed work on a new 3-story, 550,000 square foot electronic products manufacturing facility in Singapore.

Maruchan, Texas

EEA teamed with TKC Construction and GSC Architects to construct a 680,000 square feet food manufacturing plant. The facility included production areas, high-bay warehousing, and office area with the ability to quickly expand in the future.

UT Dallas Utility Infrastructure Improvements

Planning and design for future CHW and steam capacity for a new plant.

Texas State University Campus Energy Audit

EEA and The University worked together to identify 62 buildings totaling 5.7 million square feet to receive an base level energy audit and utility rate analysis.

University of Texas at Austin Tower Air Handler Replacement

EEA was tasked with replacing the existing air conditioning system for the upper half of the Tower with “zero down-time” for the building occupants.

Our Lady Queen of Peace Chapel

EEA was involved with the renovation of the chapel and the design and construction of the attached community room and ministry offices.

Sul Ross University Campus Operations

In lieu of steam system renewal, EEA was selected as Prime Consultant to design modular gas heating water systems to serve 11 buildings across the campus.