Higher Education

Campus Transformations at UT El Paso

Transformation of a mountainside back into the natural Chihuahuan Desert landscape it had once been.

St. Edward’s University Satellite Chiller Plant and Distribution

EEA’s master planning efforts for St. Edward’s University in Austin identified the need for significant increases to chilled water system capacity.

UT Dallas Utility Infrastructure Improvements

Planning and design for future CHW and steam capacity for a new plant.

Texas State University Campus Energy Audit

EEA and The University worked together to identify 62 buildings totaling 5.7 million square feet to receive an base level energy audit and utility rate analysis.

University of Texas at Austin Tower Air Handler Replacement

EEA was tasked with replacing the existing air conditioning system for the upper half of the Tower with “zero down-time” for the building occupants.

Our Lady Queen of Peace Chapel

EEA was involved with the renovation of the chapel and the design and construction of the attached community room and ministry offices.

Sul Ross University Campus Operations

In lieu of steam system renewal, EEA was selected as Prime Consultant to design modular gas heating water systems to serve 11 buildings across the campus.