MEP Engineering

Downtown Austin District Cooling System

The city needed to install a third cooling plant to cover an additional 5-10,000 tons of chilled water capacity with 10-12,000 gallons per minute pumping capacity to meet the increasing demand. However, the property presented multiple challenges.

Nutrabolt Headquarters

The facility used abundant natural light and an energy efficient Variable Refrigerant Volume (VRF) system as strategies to help it achieve LEED Certification.

Champion Office Complex

A new office building complex in the hills of west Austin receives a LEED Gold certification.

Oak Creek Plaza - LEED Gold

This two-story 45,000 square foot shell medical office building was designed and constructed in 2009.

Hyatt Lost Pines

EEA provided the hydraulic and electric design for the lazy river and multiple pools, hot tubs, and fountains located outside of the main hotel.

Tier 3 Data Center

EEA's design added two redundant 180kVA UPS, an additional 60 ton air cooled chiller, and multiple 500 gallon buffer tanks.

Chihuly Bridge of Glass

The Chihuly Bridge of Glass is a 500 foot pedestrian bridge that crosses a major Tacoma, Washington interstate.

Chemical Packaging Line Expansion

Volatile Situation In 2013 a high-purity chemical supplier to the…

UT Dallas Utility Infrastructure Improvements

Planning and design for future CHW and steam capacity for a new plant.

University of Texas at Austin Tower Air Handler Replacement

EEA was tasked with replacing the existing air conditioning system for the upper half of the Tower with “zero down-time” for the building occupants.